Decide what each approval actually covers. A material sample may establish colour or feel, while a converted first article can demonstrate fit or a process result; neither automatically releases every future delivery. Record the material identity, drawing revision and trial conditions with the inspected item. List the requirements reviewed, the evidence and any open exceptions. Retain a marked reference and identify which changes will trigger re-evaluation. The final approval should be understandable without relying on an informal message saying looks good. Production acceptance still follows the agreed inspection and change-control process for the actual order.
State what each approval covers
| Level | Evidence and result | Open or release scope |
|---|---|---|
| Direction sample | Agreed material or appearance target and sample reference | Identifies what to evaluate next |
| Material sample | Grade, specimen, method, result and outstanding requirements | Covers tested properties and stated conditions |
| First article | Actual process, drawing revision, measurements, function checks and deviations | Covers the documented process and intended part |
| Lot acceptance | Order, approved baseline and incoming inspection results by lot | Decision only for identified lots and quantity |
Keep the retained reference valid
- Label the retained sample with material, lot, side, date, approval level, version and drawing or trial references.
- Record storage conditions, responsible person and expiry or invalidation triggers, such as a changed formulation, ageing or damaged labels.
- On approval, retain requirement, evidence, result, missing evidence and exact scope. Use that scope at receiving.
Example of a partial release
A material sample clears dimensions and surface check, but first articles have yet to go through the actual punching trial. Approve the recorded material criteria and leave assembly and lot acceptance open.
Capture an actionable approval decision
| Requirement and revision | Evidence and review status | Approval scope or open action |
|---|---|---|
| Target part dimensions and fit | Part ID, controlled drawing, process settings and measured results | Identify the exact part or order released and the approver |
| Open printing, joining or packaging criterion | Name of missing record or unchecked condition | Assign the next check, owner and deadline before expanding the approval |
Common question
Does an approved sample release all later orders?
No. Confirm its scope and apply the agreed inspection and change-control requirements.